THE lines of the Federated Malay States, Straits Settlements, and Johore State Railways have a special interest of their own. They have played a major part in the opening up of a valuable part of the British Empire which, not long ago, was the stronghold of pirates and warrior tribes. The modern history of the country is, in itself, a romance, due to the enterprise of British pioneers and scientists. British Malaya is not “a white man’s country”, but because of the enterprise, knowledge, and applied science of the white man it has become of vital importance in the history of modern transport.
ACROSS THE JOHORE CAUSEWAY. A mail train of the Federated Malay Slates Railways on its journey from Singapore to Kuala Lumpur, a distance of 264¼ miles. The causeway is 60 ft wide, has a length of 3,465 ft, and connects the mainland with the island of Singapore.
British Malaya is a peninsula extending from Singapore, which is a degree and a quarter north of the equator, to the borders of Siam, nearly seven degrees north. With Sumatra on its west and Borneo on its east, it consists of a narrow tongue of land, 464 miles long, and nowhere more than 216 miles broad, forming the most southerly extremity of the continent of Asia. The surface is mountainous, the highest peak being Gunong Tahan, 7,186 ft; the longest rives is the Pahang, upwards of 330 miles in length. Except in the areas which have been mined or cultivated, a tropical forest covers the whole country, including the hills.
The country is divided up between the Crown Colony of the Straits Settlements, the Federated Malay States, and the Unfederated Malay States. There are four Straits Settlements - Singapore, Penang, and their dependencies, and Malacca and Labuan (an island off the coast of Borneo). The Federated Malay States, comprising Perak, Selangor, Negri Sembilan, and Pahang, are sovereign sultanates in treaty relations with the British Government. They are administered under the advice of a Chief Secretary, subject to the control of the Governor of the Straits Settlements in his capacity as High Commissioner. The Unfederated Malay States of Johore, Kedah, Perils, Kelantan and Trengganu, are also in treaty relations with Great Britain, but they are outside the federation.
Areas and populations are: Straits Settlements, 1,508 square miles, and 1,038,800; Federated Malay States, 27,506 square miles and 1,597,800; Unfederated Malay States, 23,486 square miles and 1,550,300. The total area - 52,500 square miles -is slightly larger than that of England without Wales.
Of the total population of over four millions, about 17,000 are Europeans. There are nearly two million Malays and one and three-quarter million Chinese, the Chinese forming quite an important section, especially in Singapore. The most ancient surviving inhabitants are the Sakais, a dark, brown-skinned race of jungle-dwellers. The Malays, who are the next oldest race, colonized the Peninsula from Sumatra about 500 years ago, and brought to it their own name.
The name “Malay” means a flower called “the mistress of the night”. The Malay is highly spoken of by those who know him. He is suave, courteous, a sportsman, and a first-class boatman, but he does not see any object in continuous hard work. He is a Mohammedan, but his womenfolk have considerable liberty. He has a sense of humour, but actively resents ridicule. If sustained effort is required of him, and if the object of it is explained to him by someone he likes and respects, he will work with cheerfulness, intelligence, and industry. The form of homicidal mania, mengamok, which impels the sufferer to run amok with a kris, neither giving nor asking quarter, is now very rare, as steps are taken to place any subject under control in the early stages of this curious state of frenzy.
British Malaya to-day is important in the economics of the world, chiefly because of its rubber and tin. The rubber tree was introduced into Malaya in 1876-77 through the Royal Botanic Gardens, Kew, Surrey, from seed collected by Sir Henry Wickham from trees in the Amazon valley in South America. The enormous demand for rubber, resulting from the invention of the pneumatic tyre, and the development of the motorcar, led to the rapid development and importance of the country.
Railway development in British Malaya is different from that in most countries, as the railway was made before the road. In nearly all other countries the jungle paths, trails, and rough roads existed for the railway to follow ; this was not so in Malaya. Once the coast was left, the tropical jungle was seldom crossed by a bridle-path. because the Malays found the waterways adequate for their transport and movement. In the Malay Peninsula the railway pioneered, river launches, generally operated by the railway followed, and the roads came third. The roads developed, and, although recently they have become competitors, they were for many years feeders to the railway.
To-day the railway system is of great importance. It is possible to travel from Siam to Singapore without a change, as the metre gauge is employed in both countries. A through express service is in operation, twice a week, with dining- and sleeping-cars, between Penang and Bangkok, the journey occupying twenty-six hours.
The total route mileage, at the time of writing, is 1,067, of which seventeen miles are double track. Of this mileage 121 miles of track in Johore are leased to the Federal Railway Administration. The railways run from Singapore, in the south, through Johore, Negri Sembilan, Selangor, Perak, Province Wellesley (included in Penang), Kedah, and Perlis to Padang Besar, on the Perlis-Siamese frontier, 580 miles from Singapore. From Gemas, on the borders of Johore and Negri Sembilan, the East Coast line proceeds northward through Negri Sembilan, Pahang to Tumpat, a port in Kelantan, on the East Coast, 328 miles from Gemas and 465 miles from Singapore. There is also a line nearly twelve miles in length, from Pasir Mas (Kelantan) to the Golok River at the Siamese boundary.
Branch lines connect the main line with railway ports at Malacca, Port Dickson (Negri Sembilan), Port Swettenham (Selangor), Teluk Anson (Perak), and Port Weld (Perak). Steam ferry services are run between Prai (Province Wellesley) and Penang, and between Palekbang (Kelantan) and Kota Bharu. The harbours of Singapore and Penang are served by the main line. Thus all the important towns are connected by rail. The main line, the Port Swettenham branch, and the branch to Sultan Street (in Selangor) are laid with 80-lb rails. The other branch lines, with one exception, are laid with 60-lb rails. The sidings are laid with 60-lb and 46¼ lb section. The sleepers, 6 ft 6-in by 10-in by 5-in, are of local hardwood.
Forty-eight of the 193 locomotives are tank engines. Of the tank type, twenty-eight engines have the 0-6-4, ten the 0-6-0, five the 0-6-2, and five the 4-6-4 wheel arrangement. Of the tender locomotives, which number 145, 116 are “Pacifics” (4-6-2’s), nineteen 4-6-0’s, and ten 2-6-0’s. There are six steam rail-cars with a total seating capacity of 642. The railway owns and operates a number of steam and motor boats. At first all the locomotives burnt wood, but since the opening of the Malayan collieries coal has been used.
The organization is vigorous; it distributes tourist literature throughout the world, and takes the opportunity on the occasion, for example, of a Chinese festival to issue posters in the Chinese language.
To induce ocean passengers to visit Malaya, the railway has arranged a first-class single fare of twenty Straits dollars (£2 6s. 8d.) between Penang and Singapore. The eastbound traveller whose boat calls at both Penang and Singapore is thus able to explore the delightful island of Penang, take the express to Kuala Lumpur, spend a day there, go on to Singapore and tour that island, and then rejoin his boat. The first-class fare works out at about a penny a mile, an extremely reasonable rate. The charge for a first-class sleeping berth is 4s. 8d., and the cars are divided into compartments, each of which contains one lower and one upper berth.
Books containing coupons for railway journeys for an aggregate distance of a thousand miles are obtainable at reduced prices, first-class being fifty Straits dollars (£5 16s. 8d.), and second-class twenty-five Straits dollars (£2 18s. 4d.).
The bulk of the goods traffic is, at present, merchandise, this item accounting for 507,122 of the 889,301 tons total of last available published traffic figures. Rubber was next with 219,677 tons; tin and tin-ore, although not in the third place, totalled 32,774 tons, the third place being occupied by coal, coke, and firewood, 93,667 tons.
The Native Employees
So rapidly has the development of Malaya followed the pioneering of the railways and the demand for rubber, that the romantic ideas of the nineteenth century about this part of the Empire are out-of-date. No longer does the resident lead a lonely existence in swamp or jungle, surrounded by wild and dangerous beasts, with his throat liable to be cut at any moment by a native, though with the prospect before him of becoming rich in a few months. The business man works from nine to six, just as he does in London, and the junior planter is up at five a.m. to attend the labourers’ muster, and is at work until three o’clock, or so, in the afternoon.
The temperament of the Malay is such that although he makes a satisfactory motor-car driver, and eighty-four of the ninety-five sailors employed for the railway craft are Malays, only nine of the 135 engine drivers are Malays. Out of 2,368, the total personnel, only 478, just over twenty per cent, are Malays, despite the long and continuous efforts of the authorities to train Malays in railway work. In recent years the Malay’s skill as a car driver has militated against the railways, as road competition has become intense.
For a long time India was the eastern outpost of the railway, as the reputation of the peoples of the Malay Peninsula was such that the country did not seem to invite railway progress. Sailors dreaded the coast, which had a reputation for piracy rivalling that of the Barbary coast.
The relations of Great Britain with Malaya date from 1600, when a charter was granted to the East India Company. Penang was granted to Captain Francis Light in 1786 by the Sultan of Kedah, in consideration for protection against his enemies. Malacca was occupied by the British in 1795, afterwards handed to the Dutch, and later received in exchange. Singapore was founded by Sir Stamford Raffles in 1819. The British policy was one of non-interference, but in 1873 the rivalry of two powerful sects of Chinese miners in the Larut district of Perak caused the British to intervene, and the following year a British Resident was appointed to the Sultanate of Perak to advise on all matters dealing with the administration of the extensive territory excepting religious affairs and native customs. Captain Light, of the East India Company, was a man of ideas. To encourage the wood-cutters in their work of clearing the jungle when he landed at Penang, he flung a bag of dollars into the jungle. In 1791 a force said to consist of 8,000 Malays attacked Penang, but Captain Light, with his 400 men, beat them off. He died three years later, knowing the settlement was flourishing.
To-day the railway traveller for Singapore takes his ticket at Penang Station, a building with a high clock tower, which is the most imposing landmark in the island of Penang. The passenger first, however, has to take the ferry boat across to the mainland, the railway departure platform being the jetty along which the passenger walks to the waiting launch, which runs to a time-table, in the same way as a train. Another point of difference is that tipping is expressly forbidden on the railways of Malaya - a pleasant surprise to the traveller from India.
The distance from Penang to Singapore is 488½ miles, and a morning and an evening express leaves each terminus. The journey takes about twenty-two hours in either direction. Both Penang and Singapore are islands; but, although the journey begins from Penang by ferry, the railway at the southern end is now carried across to Singapore on the Johore Causeway.
Penang is a hilly island with one peak 2,500 ft high. The top of Penang Hill, on which are a hotel and a number of houses, is reached by a hill railway which starts about three miles from the jetty. This Penang Hills Railway is a cable incline railway about a mile and a quarter in length. The mean gradient is slightly less than 1 in 3, and the maximum is less than 1 in 2. The drive to the cable is through an electrically-operated haulage engine, set at the top of the incline, and the railway is equipped with the necessary automatic safety appliances.
The cable is of sufficient strength to haul about fifteen times the load imposed when the car is carrying its full complement of passengers on the steepest section of the line; and two such cables are capable of lifting a modern express locomotive. The cars, with first- and second-class compartments, seat about forty passengers, There are four trains an hour, and the journey takes about twenty minutes.
Destruction by Rainfall
Construction presented a number of problems; the two most serious being the destructive force of the tropical rainfall and the intense heat. The downpour on the steep slopes of the hill is very heavy and this, combined with the heat, has broken and scoured the surface in a fantastic manner, only the prodigality of the vegetation preventing denudation of the steeper slopes.
On the upper reaches there are precipitous rock-faces; below these the hill is furrowed by gorges littered with boulders. These conditions compelled the engineers to build a solid granite causeway throughout the length of the line, the grade being formed of a succession of viaducts and cuttings. The lower station is in the Ayer Etam Valley, about half a mile from the famous Chinese temple of Loong Kong Cheng. Leaving the station, the line passes over a viaduct crossing one of the boulder-filled gorges, and then passes a smaller Chinese temple. A short distance beyond this point the viaduct carrying the track reaches its maximum height of 50 ft, and negotiates some enormous boulders. One boulder is estimated to weigh more than 12,000 tons.
After crossing the 500 ft altitude mark, the track forms two loops, and at 550 ft the ascending and descending cars pass one another. Continuing upward the incline strikes through a yawning cutting having a maximum depth exceeding 60 ft. Emerging from this, the line runs on to a viaduct spanning a small gorge, the floor of which is more than 100 ft below the line, and then runs into the Middle Station, where the passengers change cars. This section lifts the passenger to a height of 1,160 ft, and the station affords magnificent views.
A short distance beyond the station the line skirts an immense inclined boulder, and then crosses one of the largest gorges traversed on the railway. Huge boulders are strewn over the floor of this gorge, and the selection of foundations for the supporting masonry piers among this mass of rocks involved diligent search. Cleaning the gorge, the line enters a cutting and emerges upon another viaduct, set on an easy curve. At the end of this is the loop for the passing cars; then comes another deep cutting, at the top of which some of the precipitous rocky slopes of the hill on either side of the line can be seen. The line continues, by cutting and viaduct alternately, to the toot of the spur of the hill. This is so abrupt and lofty that a tunnel had to be made on a gradient of 1 in 2.
After leaving the tunnel, which is lined with concrete, the line crosses another viaduct into the Upper Station, at an elevation of 2,390 ft. The view is excellent, a hundred miles of coastline being visible, and stretching from beyond Kedah Peak on the north to the south of Gunong Bubu, in Larut. Directly opposite rises Gunong Bintang on the boundaries of Upper Perak; while the whole of the eastern coast of the Island of Penang, with its harbour, lies almost immediately below.
The port on the mainland to which the railway ferry boat takes the passenger is Prai. The first twenty miles on the journey to Singapore are through Province Wellesley. To the east are seen the hills of the main range. The train proceeds through rice-fields, coconut palms, and rubber plantations, crosses the Krian River, the boundary between the British province and Malay territory, and proceeds through Parit Buntar and more rice-fields.
Near Parit Buntar the passenger glimpses in the distance to the south the twin peaks, 5,434 ft high, of Gunong Bubu (Mount Fishtrap). According to a Malay legend a giant used to let down Mount Fishtrap into the River Perak, and lift it up again full of fish. Another explanation of the name is that the shape of the mountain top renders it difficult to climb, and more difficult to leave, like a fishtrap.
The country here is served by the Krian irrigation scheme, a shallow reservoir of about ten square miles having been created. The last railway station in this rice area is Bukit Merah (Red Hill), which is nearly forty-one miles along the route, where the train runs on a bank across the reservoir. The line next passes through a sparsely populated region of small hills, and goes on to Taiping, fifty-nine miles, the headquarters of the British administration of the State of Perak. Admirers say it is the most beautiful town in the Peninsula.
Taiping lies in the centre of the Larut plain, where tin has been mined for over half a century, and is also a centre for rubber estates. There is a branch railway to Port Weld, on the coast, this line being seven-and-a-half miles long. The branch was the first railway in Malaya, being opened in 1885.
Beyond Taiping the main line leaves the mining plain, and climbs a pass in the hills towards Kuala Kangsar, seventy-eight miles through beautiful scenery. This town is the scat of the Sultan of Perak. The pass at Bukit Gantang, when the line was being built, was a haunt of tigers, several being shot by the engineer-in-charge. The line is still favoured by tigers. One night, some years ago, a tigress and two cubs walked along the line to the platform of the station and lay down under the ticket window of the booking office. When she had rested, the tigress rose and walked off, with a cub either side of her.
Elsewhere wild animals no longer interfere with the railways, but in the early days this was not always so. One train was going through a lonely stretch of country when the driver and fireman felt the engine give a violent jerk. The next instant they were flung to one side as the engine left the rails. They crawled out, to find that the engine had been derailed by a wild elephant which had stood in the track to dispute the right of way with the train. The elephant was dead, but it had caused serious damage to the train and the track.
The railway climbs to the top of the Bukit Gantang Pass through several tunnels, and where it emerges from one tunnel, and crosses a bridge spanning a gully, there is a good view of Gunong Pondok and the valley of the Perak River. The line runs along the foot of Gunong Pondok, a tree-clad limestone rock 2,000 ft high. It is the haunt of the serau, a species of goat-antelope, which is black and shaggy, with horns, hoofs, and a wicked eye which has caused it to be likened to old pictures of the devil. There are many limestone caves on the hill, inhabited by swarms of bats. After the hill has been passed, the railway passes rubber plantations and reaches Kuala Kangsar, on the Perak River.
The commercial capital of Perak is Ipoh, 112½ miles, which is a big centre for the tin-mining industry. The finest limestone scenery in the country is in this district, and the rock temples are famous. The dry air of the neighbourhood makes the town more invigorating than any other in the Peninsula.
The line runs south from Ipoh, through Tapah Road, 145 miles, from where a branch line runs to the Perak River port of Teluk Anson. After Tapah Road the main line proceeds through jungle country to Tanjong Malim, 188½ miles, where the train leaves the forest, and crosses the Bernam River into the more open country of the State of Selangor.
This part of the railway journey to Kuala Lumpur, 242 miles, affords a variety of scenery - bamboo jungle which has sprung up where the virgin forest has been cut down, abandoned mines, open-cast mines, mines where jets of water at high pressure are used to mine the red hillsides, rubber estates, and little brick-built towns, each with a railway station.
Kuala Lumpur, where the express stops for several hours, is a garden city, and the administrative capital of British Malaya. In 1872, when it was a Chinese town with two streets, the local ruler paid cash down in the market place for the heads of his enemies.
Modern Workshops
The central workshops of the railway near Kuala Lumpur are equipped with modern machinery. Here the rolling-stock is made, and the locomotives, which are generally built in Great Britain, are erected. The line, which was built to serve the workshops, continues to a stone quarry. Beyond are the Batu Caves, which attract tourists.
Kuala Lumpur is linked with Port Swettenham by a line which is twenty-seven miles in length. The port, even younger than the capital city, dates from 1901, and was made with the aid of the railway. The line formerly ended at the town of Klang, and the site of the proposed port was a tidal flat covered with mangroves growing in mud and salt water. The line was therefore extended to the mouth of the Klang River. Thousands of truck loads of earth were carried over the line and dumped along the sea-front, where a passenger jetty and three wharves to carry railway trucks were built.
The jetty is on screw piles, but the wharves rest on cylinders driven into the mud, the deepest going down to 132 ft. During construction and afterwards, the port was a very unhealthy spot, but soon governments in all parts of the tropics began to apply the knowledge scientists had gained of overcoming malaria. The Selangor Government put a bund round the site to keep out the sea-water, and provided gates in this through which rain-water was drained. When the site was drained and dried, the malarial mosquitoes had no breeding pools. The methods were followed with an interest that was world-wide, and the work is a classical instance of the healthy results obtained when medical scientists and engineers combine in building a town on what was once a deadly swamp.
Returning to Kuala Lumpur and resuming the journey, the traveller proceeds through the pretty village of Kajang and on across the border into the State of Negri Sembilan. The name means Nine States, and is reminiscent of the old days before British Protection fused nine little Malay princedoms into one State. Seremban, headquarters of the Government, is 288 miles on the journey from Penang, and is a couple of hours’ journey from Kuala Lumpur. It is the junction for a branch line, twenty-five miles long, to the health resort of Port Dickson, which has one of the few sand beaches on the west coast of the Peninsula.
The next section of main line, some thirty miles - to Tampin, 318 miles, which is the junction for Malacca - passes through tin and rubber country at first, and then runs through the district of Rembau. This district, in common with certain others in the State, has the peculiarity that all the land is held by women, who are unable to sell it except by consent of a family council. These natives do not grow trading crops, such as coffee, rubber, or coconuts. They produce for themselves in their rice-fields and orchards. These they have created out of the jungle, and the fields look attractive from the railway.
Tampin is the junction for the line, twenty-one miles long, to Malacca. It is said that the scenery between Tampin and Malacca is the most beautiful to be seen from any train in Malaya, with distant blue hills, rice-fields, orchards, and every now and then a river or pond full of lotus plants. Malacca remembers its historic past, with its relics of Portuguese, Dutch, and British adventurers. To return to Tampin and the main line—usually the passenger for Singapore on the morning express from Penang turns into his sleeping berth after Seremban, the temperature falling at night to a refreshing coolness. Soon after leaving Tampin the line leaves the province of Malacca and travels into Negri Sembilan again, leaving this State at Gemas, 351½ miles, and entering the State of Johore. This section is not very interesting.
The City of Singapore
Gemas is important because from this town begins the East Coast railway which goes north for some 328 miles through the States of Pahang and Kelantan to Tumpat. The main line to Singapore proceeds through the State of Johore, and at Johore Bahru, 472½ miles, crosses the causeway to Singapore, the train crossing in the morning and steaming into the great port of Singapore, 488½ miles, which is on the south side of the island. On the morning express from Penang the restaurant car is taken off at Kuala Lumpur, and a parlour car and sleeping-saloons are attached instead.
Singapore is a port of world importance. Its early history rests upon a tradition that some Malays settled there about 1360, but the settlers were killed some seven years later by invaders from Java. In 1703 it was offered by the Rajah of Johore as a present to Captain Hamilton, who declined it. In 1819 Sir Stamford Raffles signed a treaty by which the Johore plenipotentiaries ceded Singapore. For many years it was a source of supply to the Malay pirates, who preyed on vessels bound to or from the port; but with the advent of steam vessels, which did not depend on the wind, the pirates were checked. The development of the railways, giving communication with those of Siam, has added greatly to the strategic importance of Singapore. Bangkok, the capital of Siam, is within fifty hours of Singapore and within twenty-seven hours of Penang.
The British Government realized from the beginning when it began to control Malaya that no other single force would exercise such a powerful and permanent steadying influence and lead to such rapid development as a system of railways. A constructional programme was therefore prepared with the purpose of building through the length of the country a continuous line, provided with lateral branch lines as occasion and traffic required.
This scheme was influenced by the fact that in Siam, a country friendly to the British development of Malaya, a scheme was in progress which would eventually take the railways to the borders of British Malaya.
But although the scheme was easy on paper there were many difficulties to be overcome. The Peninsula, covered with dense forest and jungle, was intersected by ranges of hills and mountains, between which the waterways make their winding ways east and west. As already stated, these rivers were the main arteries of native travel, and roads in the ordinary sense did not exist. Such tracks as were found proved to be ill-defined bridle-paths. Because of the heavy rainfall the vegetation is luxuriant, and the conditions were bad for Europeans. The decaying seasonal vegetation and the swamps, steaming in the heat. formed a gigantic hot-house and forcing ground for the germs of fever.
So far as supplies of material and food were concerned the country was almost barren. When the railway pioneers began, the Malays had not become accustomed to peaceful conditions, and although they produced enough food for themselves they had none to spare, also their produce was not suitable to the support of white men in the tropics.
The food problem was a vital one, and monotony of diet was one of the problems that the pioneers had to solve. Driving roads through the jungle became a task in itself. The sodden, swampy ground was too treacherous to support the weight of a loaded vehicle until a corduroy road had been made, so that before anything could be done a rough highway had first to be made, and this took time. and was attended with many troublesome breakdowns. Except for timber, every ounce of material had to be imported from Great Britain, involving a sea journey of 8,000 miles.
Opening of the First Line
The first line, less than eight miles in length, was that already mentioned, from Fort Weld, on the west coast, to Taiping, which was opened on June 1, 1885, and assisted and stimulated the tin-mining industry.
About the same time another line, farther south, from Klang, six miles up the river, was begun to Kuala Lumpur, also to develop the tin-mines. The line was opened in 1886, the future capital of Kuala Lumpur being in those days a typical mining camp.
Railway construction went on steadily according to plan. The southern section crept northward from Kuala Lumpur to Kuala Kubu. About half-way between Klang and the original line from Port Weld, another track was laid inland from Teluk Anson Wharf, while north of Port Weld a beginning had been made with two lines, the most northerly of which was the one from Port Prai, opposite Penang.
By the end of 1901 fair progress had been made, a total of 244 miles of track having been built. A general manager and a chief engineer were appointed, but both died in harness within a few weeks of each other early in 1903, and a third Briton was appointed to the dual post of general manager and chief engineer. In 1903 the initial sections of the line were linked up, giving a network of 340 miles, and affording through connexion from Penang in the north to Seremban in Negri Sembilan.
When this first section of the trunk railway was completed, efforts were concentrated upon linking it with the base of Singapore, and an agreement was concluded with the Johore State Government. The construction of the Johore State Railway was taken in hand, beginning northward from Johore Bharu, which is on the mainland opposite the island of Singapore.
Moving northwards from this point, the surveyors experienced many adventures. The intention was to make the line as straight as possible along the route of 120 miles to the boundary of Negri Sembilan, and the surveyors, who set out in March, 1904, had to tramp for a hundred miles through virgin jungle. Once they were beyond Johore Bharu there were no means of communication, and progress was reduced to a crawl. All the supplies for the survey party had to be brought up from the base by carriers, as the route lay through the jungle for nearly the whole way.
When the constructional engineers set off to follow the line of stakes they were also handicapped by the lack of transport facilities. They made roads, and corduroyed them repeatedly, to support the heavier traffic between the camps. The heavy atmosphere in the depths of the forest was exhausting to the white men. The torrential rain hampered movement, and caused the rivers to overflow. Swamps, which could not be avoided but had to be crossed, swallowed spoil and ballast greedily.
The labour of cutting the timber to make the track through the jungle was heavy. The density of the jungle, and the speed with which vegetation grew, made it essential to cut a swathe 100 ft wide on either side of the single track. Most of the trees were not of soft wood, but were hard-grained, some being of large girth. These trees provided plenty of work for the lumbermen, and they were turned to use. The trunks provided material for construction. The best timber was set aside to be taken to the railway shops to be used for building rolling-stock; the shorter, thick odds and ends of logs were stacked in piles to serve as fuel for the locomotives; while branches and trees which were of inferior wood were used for corduroying the roads. The clearing of the right of way was thus profitable, very little of the felled timber having to be disposed of by burning.
When the soil was laid bare, the railway builders found that the outlook was not attractive. The ground was streaked with rotten laterite, decayed granite and sandy clay, and was thoroughly saturated. When an embankment was raised the problem was to keep it in position, or safeguard it against obliteration by a landslide.
Abandoned Territory
So unstable was the soil that rain would set up an earth movement. The right of way was, therefore, made wider than usual to secure protection against disruption, and effective draining proved the best safeguard against landslips and subsidences in the embankment. Lallang grass was planted on the slopes, because the fibrous roots tend to bind the unstable earth and keep it in place.
The rivers and streams are numerous, and, after a heavy rain they change from insignificant waterways to menacing torrents. Culverts sufficed for the creeks, although they had to be introduced freely, averaging about four to the mile, but the larger streams had to be bridged. As far as possible bridges are standardized throughout the Peninsula with spans of 100 ft and 150 ft, so that the longer bridges are multiples of these two units. On the section from Johore Bharu to Seremban forty-nine bridges, of which nineteen exceed 100 ft in length, were set up. The heaviest work was encountered in crossing the Muar and Segamat rivers, the Muar requiring a bridge of five spans, and the Segamat one of three spans. Other streams were crossed by single or double-span bridges.
At formation level the road, although the track is of the metre gauge, was built to be adequate for the standard gauge of 4 ft 8½-in should the change ever be necessary. The ruling gradient is 1 in 100, with minimum curvature of 1,910 ft radius, to ensure economy in haulage and train speeds of up to forty miles an hour. Since the main line track was laid with 80 lb rails, it was, when it was opened for traffic, the heaviest metre gauge track in the world, operating the largest rolling-stock and heaviest locomotives built to that gauge. The locomotives weighed nearly 75 tons in working trim, and were 57 ft 11-in in length over buffers. They had cylinders 15½ by 24-in, working at 180 lb, and driving wheels of 4 ft 6-in diameter.
While this southern section was being built in the State of Johore, the northern section was being built southwards from Seremban to the inter-State boundary at the Gemas River. Although this section was only sixty-three and a half miles compared with the 121 miles of the other, it presented abnormal difficulties. For the first few miles from Seremban progress was comparatively easy, threading abandoned mining country first, and then coffee and rubber plantations. The track then passed through stretches of paddy fields, interspersed with patches of jungle, abandoned tapioca estates, and forest. These signs of settlement and development became scanty thirty-one miles from Seremban and disappeared entirely at the fifty-first mile. The remaining twelve miles or so to the Gemas River were through dense jungle which extended almost unbroken and was inhabited only by wild beasts. It was not the jungle but the gradient which was the difficulty.
The section from Seremban gave the surveyors much anxious thought, as the tail end of the mountain range which cuts across the Peninsula, presses somewhat closely upon the coast. The first plan was to carry the line to the border by way of Kuala Pilah, the headquarters of a district of Negri Sembilan. This would have involved the negotiation of the Bukit Putus Pass, 950 ft above the sea, and the climbing of 450 ft with a maximum gradient of 1 in 47½. Apart from the severity of the ruling gradient, heavy tunnelling and viaduct work would have been involved. Therefore, this route was abandoned.
The second location to be considered was through the Pabai Pass. This was more attractive than the first proposal, as the gradient could be kept down to 1 in 100, despite a vertical climb of 400 ft. But here again the heavy tunnel and viaduct work was prohibitive. It was evident that the project of carrying the line by way of Kuala Pilah, however desirable it might be, could not be achieved except at great expense. The idea was therefore abandoned, and the surveyors were given a freer hand.
There was no necessity to traverse the mountain country, which could be avoided by turning the line by way of Tampin and Batang Malaka. This alternative was carried out. In the neighbourhood of Tampin the surveyors were perplexed by the overlapping of the foothills of the mountain ranges, and by the broken character of the jungle fringing the Gemas River. Extensive surveying was necessary, because of the lack of means of communication. About 190 miles of trial lines had to be run by the surveyors, exclusive of the sixty miles previously carried through the Bukit Putus and Bukit Pabai passes, before the present route of sixty-three and a half miles could be plotted.
A Great Trunk Line Built
The survey of this section began towards the end of March, 1902, and was not completed until May, 1904; but the pathfinders gave a location with a ruling gradient of 1 in 100, and minimum curves of 1,910 ft radius, thus complying with those of the southern section in the State of Johore, although the curves had to be introduced somewhat freely to avoid heavy cutting and filling.
The railway builders began in July, 1903, and took the rails from Scremban Station towards the Malacca State boundary at Tampin, where a junction was effected with the branch to the port of Malacca. This branch line was opened for traffic in December, 1905. The main line was completed to Gemas and opened for traffic as far as this station; but not the short stretch of 1,147 yards to the boundary, beyond the station. This was held up, because the Johore State Government wished the railway to be opened through its territory in complete form, instead of section by section.
For this reason, the first seventy miles of railway out of Johore Bharu, although ready for traffic by August, 1908, were not brought into immediate service. The section to the Gemas River was pushed forward with all speed. On July 1, 1909, the whole of the railway through Johore was brought into service, and through communication was thus established with Penang.
By this date the whole Peninsula, with the exception of the less accessible State of Pahang to the north, was provided with a railway backbone. The jungle was subdued. The country was provided with a great trunk line, as well as a number of short lines running to the coast from important centres, and tapping all promising and productive zones.
Although Johore Bharu was the southern terminus of the railway, it was on the mainland, and not on the island of Singapore. To make contact with the great port without transhipment, a freight-car ferry system was organized between the terminus on the mainland and Woodlands, a station on the island. From Woodlands the trains of the Singapore Government Railway ran across the island to the port and city. Passengers were taken across the straits in launches.
This system had obvious disadvantages, and the work of building a causeway to carry the railway and a road was put in hand.
As early as 1904, it was suggested that the straits should be bridged, but this, and other suggestions, had to be put aside for years, and it was finally decided that a rubble causeway should be substituted for a bridge. The official inauguration of the causeway works took place in April, 1920, when the Governor deposited two barge loads of rubble in the centre of the straits. The ceremonial opening was performed in June, 1924, by the Governor in the presence of the Sultan of Johore and the rulers of the Federated Malay States.
The causeway is 60 ft wide at the top, and carries two tracks of railway and a 26 ft roadway. The total length is 3,465 ft. The greatest depth crossing the strait is 77 ft, the average depth of water at low tide being 47 ft. Provision was made at the Johore end of the causeway for the passage of small local craft by the provision of a lock, 510 ft long from end to end. The lock is provided with a double set of gates spaced 170 ft. apart, with a width inside the gates of 45 ft., and outside of 32 ft. This lock has been crossed by a Scherzer roller bridge with three girders. The bridge is 57 ft total width, and carries two lines of railway, and a clear roadway of 24 ft 6-in. The lift bridge, weighing 570 tons, and the tide gates are operated electrically. In the construction of the causeway a total of 1,641,712 cubic yards of granite was used.
A Link with Siam
The work of providing the trunk line with feeders was pursued during the construction of the main line and afterwards. The fifteen miles branch from Ipoh, in Perak, to Tronoh, which serves the Kinta Valley tin-mines, was built in 1905. The same year the branch line from Kuala Lumpur to the railway workshops and to Batu Caves (five and a quarter miles), where ballast material was quarried, was constructed. Another short line was run out to the tin mines at Ampang. A branch from Kuang to Batang Berjuntai, fourteen miles long, taps the coalfield, the coal being used by the railway.
Once the main line from Prai to Johore Bharu was completed, the railway builders turned their attention to the northern part of the Peninsula to carry out the project of linking up with the railways of Siam. The line from Prai was picked up at Bukit Mertajam, which is about seven miles from the port, and was advanced northward into the State of Kedah, reaching the capital, Alor Star, in 1915 - sixty-three miles from Prai. The engineers pressed forward, carried the line into the State of Perlis, and proceeded to the northern frontier of the Federated Malay States at Padang Besar, which is 105 miles from Prai. Here the line joined that of the same metre gauge which had been brought down through Siam, thus providing a line linking Bankgok with Singapore.
Before the rails met, the alert authorities had visualized the effect the junction would have on sea-borne traffic. It was not economic to move Siamese traffic to or from Singapore, or even Port Swettenham, if a more suitable shipping point nearer the Siamese border, and available for ocean-going vessel, could be found. The obvious port was Prai, but in its condition at that period the port needed improvements. The chief engineer and general manager of the railway therefore recommended a comprehensive scheme of development which would enable large ships to berth alongside the wharves and load and unload into railway wagons direct or into transit sheds. In 1914, before the rails of British Malaya had met those of Siam, the Malayan authorities had decided to adopt this plan. But the outbreak of war delayed the beginning. In 1917, however, when extensive dock works had been completed at Singapore, the plant used for this work was released; so the contractors brought it north to Prai and the work began in May, 1918.
The work included the construction of a reinforced concrete jetty, 1,100 ft in length, at the mouth of the river; the continuation upstream of the existing wharf for 600 ft, and beyond a coal wharf 900 ft long - a total wharf frontage of 2,600 ft, with a minimum depth of 30 ft of water for vessels alongside. Work also included a lighter basin 1,100 ft long with a minimum depth of water of 16 ft; dredging and deepening the main channel and approaches to a depth of 30 ft and a width of 500 ft; and, finally, the reclamation of nearly 200 acres of swamp, fringing the river, with the foreshore.
Enlarging a Modern Port
As little was known of the site before the coming of the railway, exhaustive surveys and borings were essential. The river-bed was the critical factor, and this was found to comprise a thick layer of mud upon an extensive stratum of sand, encountered at an average depth of about 55 ft below low water. The depth of this underlying sand remained problematical until 1917, when it was found to extend downwards for 270 ft under the silt - 315 ft below low water - to be of varying degree of coarseness, and to rest upon a hard, igneous rock.
It was decided to use the sand as the foundations for the wharves and jetty, and a specially massive design of ferro-concrete structure, supported on concrete cylinders sunk through the mud, was adopted. The cylinders, with an external diameter of 8 ft 6-in, are set in forty-five rows, spaced 25 ft apart, centre to centre, with seven cylinders to each row, and spaced 22 ft apart, centre to centre, over a depth of 142 ft. These support the heavy ferro-concrete superstructure forming the deck of the wharf and jetty. On this are carried the cranes for loading and unloading vessels, the sidings of the railway with a turntable at either end, and the usual additional mechanical handling appliances.
The coal wharf and widening, extending upstream for 1,500 ft, follow the concrete block wall design. This wall is protected against the scouring action of the river by an apron of rubble extending from the toe of the wall for a distance of about 35 ft.
The widening and deepening of the main channel and approaches was the largest individual item of the enterprise. This work entailed the removal, by dredging, of 2,250,000 cubic yards of material from the river-bed, in addition to which silt accumulating during the progress of the work was removed. The silt was a formidable factor, as the river brings down an immense quantity of soil in suspension, and deposits it at this point where the flood tide from the sea checks the current of the river, causing the matter in suspension to be deposited. The spoil brought up by the bucket dredgers was loaded into lighters of 350 cubic yards capacity. These lighters, when filled, were towed to the reclamation site, and there discharged by means of pumps on to the low-lying swamps fringing the bank and the foreshore. A retaining wall was erected to hold the deposited spoil in place.
Special arrangements were adopted for draining this water-logged mud, the area being subdivided into sections for the purpose. The sections permitted the mud to settle, and the superfluous water was drawn off from one section while another was being charged. During the dry season the settling of the mud, draining of the water, and the consolidation, or drying, of the material was fairly rapid; in wet weather from six to twelve months had to elapse to allow the material to be hard enough to allow of movement upon its surface. When the scheme was completed the terminal port of Prai became one of the finest and best equipped along the western coast, north of Singapore.
Thus the railway conquest of the Federated Malay States was carried out along the western coast. This side of the Peninsula is the more densely settled and is more easily accessible.
The eastern state of Pahang, however, differs markedly, the chain of mountains cutting it off from its neighbours. Because of this and the fact that in building a railway in an undeveloped country the first lines are built where they are most urgently required and where the traffic will justify them, the east coast was left until the western seaboard railway system was adequate.
When this was so the railway engineers turned their attention to providing the east side of the country with lines to facilitate settlement, and to provide a link with the interior.
At the Frontier
Work began in the north-east corner, in the State of Kelantan, this point being selected because the Siamese State Railway system had pushed its rails to the frontier at Sungei Golok. Far away to the south work began also at Gemas, where, as we have seen, the original system, crosses into the State of Johore. The first thirty-two miles of the northern division out of Tumpat were opened for traffic in 1914, while the southern section had been advanced 146 miles from Gemas well up into the State of Pahang. The work advanced with many interruptions on this East Coast Railway, and the lines met in 1931. This achievement resulted in a 328 miles length of line from Tumpat to Gemas and 465 miles from Singapore. A line thirteen miles in length branches off from Pasir Mas, a station about fifteen and a half miles south of Tumpat, to the Goluk River, on the Siamese border, where the Siamese Railway links with it. By means of the junction at Gemas, this East Coast Railway is connected with the ports on the west coast. There are thus two connexions with the Siamese railways, one being at Padang Besar on the western side, and the other at Rantau Panjang on the eastern side.
The construction of the East Coast line cutting diagonally across the Peninsula from Gemas was difficult, because of the obstacle of the mountains. The pathfinders tried to obtain a line that would conform in gradient and curves with the lines already built, but the quest was tantalizing. In accordance with general practice, the surveyors endeavoured to turn the courses of the streams to account. They followed one river here, crossed another there, and picked up another elsewhere, as far as the watershed, and then followed a similar practice down the opposite slope. In this manner the surveyors brought back proposed locations conforming to the general scheme of the railways - no gradient steeper than 1 in 100, and no curve of sharper radius than 1,910 ft.
In the search for an easy gradient, the first trial line was run from Gemas Station up the valleys of the Muar and Serting rivers for thirty-two miles. Then it struck almost due north, crossing the Triang River, to pick up the Pahang River, to which it clung for six miles to the junction of the Semantan and Pahang rivers at Temerloh. But this line had the disadvantage of requiring heavy development work between the fourteenth and twenty-fifth mile-posts, so an alternative line was driven. This avoided tunnelling, but introduced sharper curves to round the spurs thrusting themselves upon the Muar River, and also heavy bridging, although the gradient was maintained. Also, the deviation increased the length of the line by two miles. Although this second route would have cost nearly £10,000 a mile it was cheaper than the first.
Further consideration of the surveys induced the chief resident engineer, in charge of work in the field, to try to find a third route. He instructed the surveyors to explore the lie of the land farther to the east, with the result that a third and superior line was adopted.
This abandons the original alinement altogether upon leaving Gemas Station, bearing more to the north, and crossing the Muar River near the sixth mile-post. After leaving the river it swings towards it and then turns away again. At the twenty-third mile it crosses the Bahau and Serting rivers, and the Triang River at mile 55½. The Pahang River is approached, but not crossed, and at Temerloh, seventy and a half miles from Gemas, the temporary railhead was planted. This location reduced the mileage by about eight miles, eliminated all heavy work, and pulled the costs down to £7,990 per mile, inclusive of rolling-stock.
The surveyors found the country sparsely populated. Two miles from Gemas they discovered a small native village, or kampong, of about forty people, engaged in the breeding of buffaloes, the cultivation of rice, and the collection of jungle produce which they exported by means of the river.
Thrusting the Line Northwards
Small settlements were discovered at intervals up to Rompin, where the surveyors found a Malay village of seventy inhabitants. Throughout the next few miles only a few isolated huts were seen, these being occupied by Sakais, the aborigines, who eke out a living by cultivating maize and yams. Bahau was only a small Malay kampong; but from a point two miles beyond, to Kuala Pilah, the country was fairly well populated by Malays. One stretch of country, thirty-five miles in length, was practically devoid of human life, only Sakais being met at intervals. Near the Triang River the Malays were numerous, as they were when the Pahang River was approached. For about two-thirds of the distance the alinement ran through virgin jungle that yielded very little serviceable timber, the trees rarely exceeding 2 ft in diameter. Plenty of coarse sand, suitable for ballasting and mortar, as well as a clay for making bricks, was found along the route.
From Temerloh, the next stage northward was to Kuala Tembeling, 117 miles. This section is roughly parallel with the Pahang River, which flows into the China Sea, and the line was set back so that a fairly straight alinement, avoiding the windings of the river, was presented.
The country traversed was practically uninhabited virgin jungle. There were settlements on the banks of the river, the highway of the natives, but these did not penetrate the forest to any distance. This population became more scanty as the railway pushed northwards, the villages being very small and infrequent, and peopled by natives of an inferior type. There was no sign of any industrial activity along this length of the line.
By keeping near to the river the engineers were able to round the Tahan Mountains on the east, and obtained not only a much shorter road than would have ensued had the western turning of the mountain been adopted, but also one which was considerably cheaper and more economical to lay. The section north from Tembeling to Kuala Lipis, 141 miles, was opened in 1917. This part of the line followed the river and involved at one point the construction of a retaining wall 400 ft in length and a viaduct of three brick arches. To the north, in Kelantan, thirty-two miles were opened in 1915 from Tumpat south-ward to Tanah Merah. The war of 1914-18 hindered the construction, work on the northern section being stopped for more than three years.
Soon after the war the resumption of work was hampered by trade depression, and it was not until 1921 that a further stretch of five miles of track was added to the southern section, which was creeping up northward from Kuala Lipis, the new railhead being at Padang Tungku.
The engineers working southward reached the Kelantan River, thirty-five miles from Tumpat, and work on the building of the Guillemard Bridge was begun in 1920. This bridge, which was opened in July, 1924, was the largest in the Peninsula, being 2,166 ft. long over all, and composed of five clear spans of 250 ft each and five spans of 150 ft. The height from the river bed to the underside of the girders is 55 ft. The quantity of concrete and brickwork in abutments and piers is about 20,000 cubic yards, and the total weight of steelwork in the girders is 2,776 tons. As the work proceeded in this Kelantan section a number of tunnels had to be constructed. Progress during the years was in accordance with the money allocated out of the resources of the Peninsula.
It was not until September, 1931, that the East Coast Line was opened to traffic, the last section to be completed being that between Gua Musang (200 miles from Gemas) and Kuala Gris, in Kelantan. A through service was begun, an express leaving Tumpat, the northern terminus, every Thursday morning, with day and night accommodation, and reaching Singapore the next morning, the journey occupying twenty and a half hours. The express in the reverse direction leaves Singapore on Sunday evening, and arrives at Tumpat on Monday afternoon. Mixed trains (passengers and goods) run in addition.
£70,000 for Repairs
At the end of the year, in December, the Peel Bridge at Kemubu, 235½ miles from Gemas, collapsed because of the abnormal rise of the river. The bridge consisted of two main spans of 250 ft each and a land span of 150 ft. The river, after having begun to rise at the rate of 10-in an hour, reached the girders, and the rise then increased to 18-in an hour, the water flooding the railway track to a depth of 9 ft. All the time the rain-swollen current was sweeping down at the rate of ten knots, pounding timber and logs against the steel work. The bridge became a dam against which all the trees and matter brought down by the river piled up hour after hour. To the anxious onlookers it seemed incredible that the bridge should hold. The flood water reached the bottom boom of the bridge in the afternoon at 3.30 on December 18, and more than seven hours later the bridge was still intact despite the fact that something like twelve acres of trees and logs were jammed against it by the terrific force of the water. About 11 pm, however, the two 250-ft spans gave way, the lateral pressure against the girders being overwhelming.
Apart from the work of rebuilding the bridge, the line was badly damaged at many points, and the cost of reconstruction was more than £70,000.
The engineers and administrative officers had a busy Christmas. The line was closed for only a few days, as it was imperative to get food through to the regions devastated by the floods. A train was sent out on December 22 from Kuala Lipis, in Pahang, under orders to go north as far as possible. This was forced back by the floods. A railway tug and a lighter were then sent from Kota Bahru up the swollen River Kelantan to Krai with food for the suffering natives. By Boxing Day the railway officials at Kuala Lipis had got into operation a temporary train service to Gua Masang, while their colleagues more than 130 miles to the north at Krai, in Kelantan, were stretching out a temporary service to the south. Some very fine work was done to relieve distress during this period of flood. It was not until months had passed, in April, 1932, that the East Coast Line was reopened throughout its entire length.
While the East Coast Line at the northern end of the Peninsula was being repaired and consolidated in 1932, important developments were being completed at the southern end, on the island of Singapore, this work being the consummation of a programme which had been in hand for some three years.
When in June, 1932, the Governor of the Straits Settlements, Sir Cecil Clementi, opened the new terminal station at Singapore, he said that he stood at the end of a chain of railways which would one day form a continuous line of permanent way from the Strait of Dover through Europe, Turkey, Mesopotamia, Persia, Baluchistan, India, Assam, Burma, Siam and Malaya to where he stood. The missing links in the chain are from Prachuah in Siam to Ye, the Siamese end of the Burma system, between Burma and Assam, between Baluchistan and Basra (Iraq), between Mosul (Iraq) and Aleppo (Syria), and the ferry across the Bosphorous, between Asiatic and European Turkey.
Batu Arang Station
BATU ARANG STATION, on a branch tine between Kuala Lumpur and Penang, lies some twenty-two miles from Kuala Lumpur. Kuang Junction is at the head of this fourteen-miles branch line leading to Batang Berjuntai, the terminus. (Page 968)
(source: http://www.railwaywondersoftheworld.com/malayan_railways.html)
愛墾網 是文化創意人的窩;自2009年7月以來,一直在挺文化創意人和他們的創作、珍藏。As home to the cultural creative community, iconada.tv supports creators since July, 2009.
Added by engelbert@angku张文杰 0 Comments 71 Promotions
Posted by 馬來西亞微電影實驗室 Micro Movie Lab on February 21, 2021 at 11:00pm 7 Comments 60 Promotions
Posted by 馬來西亞微電影實驗室 Micro Movie Lab on February 18, 2021 at 5:30pm 18 Comments 73 Promotions
Posted by Host Studio on May 14, 2017 at 4:30pm 11 Comments 49 Promotions
Posted by 用心涼Coooool on July 7, 2012 at 6:30pm 39 Comments 53 Promotions
Posted by 就是冷門 on August 24, 2013 at 10:00pm 79 Comments 81 Promotions
Posted by 罗刹蜃楼 on April 6, 2020 at 11:30pm 40 Comments 66 Promotions
Posted by 葉子正绿 on April 2, 2020 at 5:00pm 77 Comments 69 Promotions
Posted by Rajang 左岸 on August 26, 2013 at 8:30am 29 Comments 61 Promotions
Posted by 來自沙巴的沙邦 on November 4, 2015 at 7:30pm 3 Comments 76 Promotions
Posted by Dokusō-tekina aidea on January 5, 2016 at 9:00pm 35 Comments 73 Promotions
© 2024 Created by 馬來西亞微電影實驗室 Micro Movie Lab. Powered by
You need to be a member of Iconada.tv 愛墾 網 to add comments!
Join Iconada.tv 愛墾 網