文化有根 創意是伴 Bridging Creativity
SPCC COMPLIANCE: DESIGN BUILD CONSIDERATIONS FOR SECONDARY CONTAINMENT Ronald Elder, P.E. Burns & McDonnell Engineering Company, Inc. St. Louis, Missouri • Overview of Secondary Containment - Focus: Bulk Storage Tanks > 100,000 gallons - Earthen Dikes - Concrete Dikes - Steel Wall Systems SPCC testing appointments must be made online at spcc.edu. SPCC student cost is $73; non-SPCC student cost is $93 (fee subject to change) paid to SPCC Business Office on the phone or in person. Must present a photo ID, SPCC receipt, and know ATI login at testing appointment. Can be taken once every 3 months at SPCC. An SPCC plan, or spill prevention plan, is the required documentation for the prevention and mitigation of oil spills in navigable waters or shorelines. SPCC means Spill Prevention, Control, and Countermeasure—a regulation that is part of the U.S. federal law, also known as Rule 40 CFR 112. SPCC Plan Template - Tier 1 Tier I Qualified Facility SPCC Plan This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a facility that meets the applicability criteria in §112.3(g)(1). This template meets the requirements of 40 CFR part §112. Maintain a complete copy of the Plan at the facility if the facility is This template is intended to help the owner or operator of a Tier I qualified facility develop a self-certified SPCC Plan. This template provides every SPCC rule requirement necessary for a Tier I qualified facility, which you must address first and then implement the Plan. You may complete this template either electronically or by hand. (3) Complete an SPCC Plan if you are eligible for self certification. Disclaimer This document is not intended to be a comprehensive review of the SPCC Requirements. This guidance and Template was prepared based on the SPCC Rule revisions dated November 13, 2009 , and the . Tier I Qualified Facility SPCC Plan Created Date: 1/22/2014 9:48:50 AM table of contents 1.0 introduction 2.0 administration 2.1 policy 2.2 certification (40cfr112.3(d)) 2.3 coverage 2.4 administration of responsibility 2.5 inspections and nonconformance 2.6 record-keeping requirements 2.7 plan location 2.8 plan review & changes 3.0 facility description 3.1 flood drainage 4.0 oil storage — description, use & location SPCC and Industry Standards by Philip E. Myers ChevronTexaco EPA Fresh Water Spills Cleveland, Ohio, March 19-21, 2002 Sheraton Cleveland City Centre Hotel. Key Theme - Industry Standards This Spill Prevention Control and Countermeasure(SPCC) Plan describes the procedures for the prevention and control of oil and fuel spills into any of the sewer systems. A number of fuel storage vessels and oil-filled transformers are located across campuses. Table I lists the aboveground fuel storage sites and capacities. Spill Prevention, Control, and Countermeasure SPCC Regulations: Background and Issues for Congress Jonathan L. Ramseur Specialist in Environmental Policy September 28, 2016 Congressional Research Service 7-5700 crs.gov R44536 Spill Prevention, Control, and Countermeasure (SPCC) Regulations Congressional Research Service Summary Facility Name: CSU Dominguez Hills Page 1 Tier I Qualified Facility SPCC Plan This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a facility that meets the applicability criteria in §112.3(g)(1). This template addresses the requirements of 40 CFR part 112. Maintain Facility Name: CSU Dominguez Hills Page 1 Tier I Qualified Facility
愛墾網 是文化創意人的窩;自2009年7月以來,一直在挺文化創意人和他們的創作、珍藏。As home to the cultural creative community, iconada.tv supports creators since July, 2009.
Added by engelbert@angku张文杰 0 Comments 71 Promotions
Posted by 馬來西亞微電影實驗室 Micro Movie Lab on February 21, 2021 at 11:00pm 7 Comments 60 Promotions
Posted by 馬來西亞微電影實驗室 Micro Movie Lab on February 18, 2021 at 5:30pm 18 Comments 73 Promotions
Posted by Host Studio on May 14, 2017 at 4:30pm 11 Comments 49 Promotions
Posted by 用心涼Coooool on July 7, 2012 at 6:30pm 39 Comments 53 Promotions
Posted by 就是冷門 on August 24, 2013 at 10:00pm 79 Comments 81 Promotions
Posted by 罗刹蜃楼 on April 6, 2020 at 11:30pm 40 Comments 66 Promotions
Posted by 葉子正绿 on April 2, 2020 at 5:00pm 77 Comments 69 Promotions
Posted by Rajang 左岸 on August 26, 2013 at 8:30am 29 Comments 61 Promotions
Posted by 來自沙巴的沙邦 on November 4, 2015 at 7:30pm 3 Comments 76 Promotions
Posted by Dokusō-tekina aidea on January 5, 2016 at 9:00pm 35 Comments 73 Promotions
© 2024 Created by 馬來西亞微電影實驗室 Micro Movie Lab. Powered by
You need to be a member of Iconada.tv 愛墾 網 to add comments!
Join Iconada.tv 愛墾 網